Showing posts with label frame erecting. Show all posts
Showing posts with label frame erecting. Show all posts

Sunday, 6 December 2009

The frame goes up at last!

Thank you to everyone for your concern about David following his recent surgery. I am very pleased and relieved to announce that all danger has passed, he is well on the way to recovery, had his first short, chilly walk around the garden yesterday and is thoroughly bored - always a good sign!

Given all the above progress, I thought it was time for the promised post on the day David came up to help us build the tea house frame on site - because, as Himself commented, David was absolutely the best person for the job! As a surgeon, David has had to be thorough, meticulous, precise, not panic when things go wrong and not rush things (sound familiar?!), all of which suited Himself down to the ground for putting the frame together!
First though, I had yet more painting of the 3 coat sealant to do!

The dry beams and posts were carried onto site - about 100 yeards up the garden!
Himself had earlier removed the posts that he, I and the Gnomelets had previously erected twice (*sigh*) then he and David began to lay out the pieces like a 3D puzzle.


Daring to glue the first joint!

Of course, being Himself and David, a few screws went in too ..... just to be on the safe side you understand - can't be too careful!

Checking the diagonals to ensure the corner angles were all even.

The long side of the frame in place, levels being checked - and, oh look, I'm balanced on a wobbly plank over water again! I am convinced that Himself thinks that if he puts me on a plank across the pond often enough, at some point I WILL fall in - and that'll be his payback for all his hard work. Mwahhaahaaa!


Some joints needed a bit of persuasion to go together after glueing, so we brought out our trusty strop and hand ratchet (originally used for pulling me - well, the Land Rover actually, out of muddy holes in off road driving competitions!). It works just as well for pulling chunks of wood together though!
Guess who got to walk the plank again?

Squatting down to put the strop round the bottom beam didn't make me fall in even when Himself 'accidentally' kicked the other end of the plank, so he then had me up on my tiptoes to shove the strop as high up as I could reach - ostensibly to pull the top posts together, but I knew his cunning little plan.........!
David meanwhile happily carried on glueing the next set of joints, seemingly oblivious to his son's nefarious tricks to dunk me in the drink!


Don't be fooled by that innocent expression of concentration as he tightens up the ratchet, he was really planning his next move!


Having failed to get me wet, Himself resorted to putting up the back wall frame and muttering to himself about "....her improved balance.... chunter, chunter"! David happily carried on holding posts in position.


Moving swiftly on to erect the long side wall against our boundary.

Got to keep checking those diagonals boys!
The strop was used for fine-ish adjustment.

Bracing was put in place to provide some short-term stability and rigidity to the structure whilst the concrete went off.........

Each upright post had a stainless steel 'foot' which was concreted into a post hole. Of course plain simple concrete wasn't considered strong enough(!), so stainless steel wall ties were threaded through the foot and angled into the concrete - just to make sure!!!

As Technician, Third Class still working on my promotion prospects, I was allowed to pour and shape the cement - making sure that it sloped away from the foot for drainage.

As Gordon Ramsey might say........."Framework -Done"!


and I still hadn't fallen in!